Loading episode...
Hometime
Season 24 • Episode 1 • Sculpture Studio Extension - Floor
Select Server:
Hometime Season 24, Episode 1: Sculpture Studio Extension - Floor
The Hometime crew uses pavers and retaining walls to capture space under a second-story deck. Watch Hometime Season 24, Episode 1 Sculpture Studio Extension - Floor in HD free online. Enjoy high-quality streaming of Hometime Season 24, Episode 1 and share your thoughts in the comments below!
Comments
No comments yet. Be the first to comment.
Episodes
26 episodesSculpture Studio Extension - Floor
The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.
30 min
Sculpture Studio Extension - Walls
The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.
30 min
Sculpture Studio Extension - Wrap Up
The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.
30 min
Stone Cottage – Cul-De-Sac Prep
The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.
30 min
Stone Cottage – Concrete & Foam
The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.
30 min
Stone Cottage – Instant House
The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.
30 min
Stone Cottage – Roofscape
The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.
30 min
Stone Cottage – Windows
The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.
30 min
Stone Cottage – Concrete Floors
The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.
30 min
Stone Cottage – Inner Workings
The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.
30 min
Stone Cottage – Insulation
The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
30 min
Stone Cottage – Geothermal
The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
30 min
His and Her Garage
The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."
30 min
Stone Cottage -- Interior Walls
After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
30 min
Stone Cottage -- Vaulted Ceilings
The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
30 min
Stone Cottage -- Millwork
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.
30 min
Stone Cottage -- Exterior Doors
The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
30 min
Stone Cottage -- Tile
The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
30 min
Stone Cottage -- Driveway
The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
30 min
Stone Cottage -- Interior Doors
The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
30 min
Stone Cottage -- Laundry Room
The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
30 min
Stone Cottage -- Office
The home office begins to take shape, as the custom staircase work begins.
30 min
Stone Cottage -- Countertops
The stone countertops are fabricated and installed.
30 min
Stone Cottage -- Fixtures and Appliances
The Hometime crew installs cabinets, countertops and landscaping.
30 min
Stone Cottage -- Retractable Screens
The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.
30 min
Stone Cottage -- Sod and Stone
The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.
30 min